Project Description:
The North River Drive Public Access Improvement project will include a combination of improvements to meet current and future needs. The project begins at the intersection of North River Drive and Pleasant Valley Road and terminates at the intersection of North River Drive and Foster Dam Road. The following are improvements to be included with this project:
- Minor realignment of the geometry of curved sections of roadway will improve roadside safety and improve access for truck traffic to vital natural resources along this natural corridor.
- Asphalt pavement grinding to remove old asphalt and to minimize increasing the depth of asphalt installed.
- Repair of cracks within the roadway section
- Asphalt pavement overlay to protect and preserve the existing roadway.
During construction, the road will be open to traffic, but expect delays.
Funding:
- Source: Federal (WFL*)
- Preliminary Engineering: $352,732.60
- Construction: $2,790,822.60
- Total Project Cost: $3,143,555.20
- County Share: $322,843.12
Schedule of Funding Obligations:
- Preliminary Engineering: FFY2021
- Construction: FFY2025
County Facility Number: CR0908
Project Number: CR2101
ODOT Key Number: KN21900
*Western Federal Lands